Solar Power Installation Scheduled
Solar Power Installation Scheduled
The plans were approved earlier this week, and Solarcity called me on the phone and emailed to setup an installation time, which I was able to arrange very conveniently via email. The assigned installation team are finishing up another job, then Im next, starting tomorrow (Friday 24th July) for a few days.
There has been nothing to show so far, but I will be taking pictures and posting them.
Looking at the options for electric water heating led us to consider a ground source heat pump (GSHP), plans are still in flux, but Im looking at adding a heat pump that will heat hot water as well as heat and cool the house. The ground source part is that it doesnt have a conventional air fan based heat exchanger, it runs water through underground pipes. This is relatively expensive, but there are rebates, and it is very efficient. More later...